01 · 2020 · Zhao’an, Zhangzhou, Fujian, China
Chengxi wastewater plant online monitoring upgrade
- Project background
- The Chengxi wastewater-treatment project was documented with a total investment of CNY 200 million and a treatment scale of 125,000 tonnes per day. The construction formed part of a regional environmental-treatment and ecological-improvement program.
- Implementation
- In December 2020, online analyzers were installed for continuous wastewater monitoring, including suspended solids / sludge concentration alongside organic and nutrient parameters and dissolved oxygen.
- Monitored parameters
- Suspended solids / sludgeCOD / organic loadAmmonia nitrogenTotal phosphorusTotal nitrogenDissolved oxygenLiquid level
- Suspended-solids / sludge configuration
- PSS-800 was documented as the optical suspended-solids / sludge-concentration measurement in the project configuration.
- Project role
- The system provided continuous multi-parameter visibility for routine plant operation and environmental management.